NO. 4707. SHRI VINAYAK RAUT

Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state:

(a) the number of houses in the country particularly in Ratnagiri-Sindhudurg of Maharashtra for which foundation has been laid under Pradhan Mantri Awas Yojana-Urban (PMAY-U) during the last three years and the current year, State-wise;

(b) whether their construction work has been completed, if so, the details thereof and if not, the reasons therefor;

Houses under Pradhan Mantri Awas Yojana-Urban

(c) the details of the foundations laid for the construction of houses under the said scheme during the said period;

(d) whether their construction work has not been started or completed and if so, the reasons therefor;

(e) the details of the minimum areas fixed for the houses completed during the said period, State-wise; and

(f) the details of all kinds of changes made in the size of houses by the States during the said period?

ANSWER
THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS

(SHRI KAUSHAL KISHORE)

(a) to (c) Land and Colonization are State Subjects. Therefore, Schemes on housing are implemented by States/ UTs. However, Ministry of Housing and Urban Affairs under the vision of ‘Housing for All’, is supplementing the efforts of States/ UTs by providing central assistance under Pradhan Mantri Awas Yojana- Urban (PMAY-U) for construction of houses for all eligible families/ beneficiaries. Eligible beneficiaries can avail the benefit of PMAY-U through four verticals, i.e., Beneficiary-led Construction or enhancement (BLC); Affordable Housing in Partnership (AHP);  ‘In-Situ’ Slum Redevelopment (ISSR) and Credit Linked Subsidy Scheme (CLSS).

Under PMAY-U, State/UT wise details of houses sanctioned during last three and current year (2018-2022) along with status of houses grounded for construction and completed is annexed as Annexure. In Ratnagiri- Sindhudurg in Maharashtra, 4,955 houses have so far been sanctioned of which 3,209 are grounded for construction and 2,950 have been completed.

(d) States/ UTs formulate project proposals as per their assessed demand of houses under the Scheme in aphased manner based on their resources and get them approved by State Level Sanctioning & Monitoring Committee (SLSMC). After approval from the concerned SLSMC, States/ UTs submit the proposals to this Ministry for approval of Central Assistance by the  Central Sanctioning  and  Monitoring Committee. Completion of projects generally takes 12-36 months under different verticals of Scheme. States/ UTs are required to adhere to the timeline as mentioned in Detailed Project Reports for completion of project. Accordingly, progress of the Scheme varies from State to State. In order to achieve the vision of ‘Housing for All’, all States/UTs have been advised to expedite the construction of sanctioned houses so that all houses are completed within the stipulated period.

(e) & (f) As per Scheme guidelines, the minimum size of houses constructed under the Mission under each component should conform to the standards provided in the National Building Code (NBC). However, if the available area of land does not permit building of such minimum size of houses as per NBC and, if beneficiary consent is available for reduced size of house, a suitable decision on area maybe taken by States/UTs with the approval of State Level Sanctioning and Monitoring Committee (SLSMC).The Mission supports construction of houses upto 30 square meter carpet area with basic  civic infrastructure. States/UTs have  flexibility in terms of determining the size of house and other facilities at the State/UT level in consultation with the Ministry. Under Credit Linked Subsidy Scheme vertical, permissible carpet areas are as under:

Particulars

Economically Weaker Section (EWS)

Low Income Group (LIG)

Middle Income Group (MIG-I)

Middle Income Group (MIG-II)

Scheme duration

17.06.2015 to 31.03.2022

01.01.2017 to 31.03.2021

Carpet Area

Upto 30 sqm.

Upto 60 sqm.

Upto 160

sqm

Upto 200 sqm.

States/ UTs are required to adhere to the area of the houses as proposed in Detailed Project Reports.
Annexure referred in reply to Lok Sabha Unstarred Q No. 4707 due for 31-03-2022
State/UT wise details, including State of Maharashtra, of houses sanctioned during last three and current year (2018-2022) along with status of houses grounded for construction and completed thereof under PMAY-U

Sl. No.

State/UT

Houses

(Number)

Sanctioned

Grounded

for

construction

Completed

1

A&N Island (UT)

578

578

23

2

Andhra Pradesh

16,61,980

13,25,466

1,56,280

3

Arunachal Pradesh

3,665

1,197

390

4

Assam

1,12,049

66,907

13,347

5

Bihar

2,34,416

1,38,597

28,092

6

Chandigarh (UT)

1,012

1,012

1,012

7

Chhattisgarh

2,20,475

1,40,535

81,015

8

UT of DNH & DD

5,499

5,425

4,907

9

Delhi (NCR)

23,715

23,715

23,715

10

Goa

2,600

2,600

2,600

11

Gujarat

6,71,390

6,16,779

4,98,464

12

Haryana

1,00,574

42,378

36,925

13

Himachal Pradesh

7,212

6,519

2,914

14

J&K (UT)

39,325

30,286

7,187

15

Jharkhand

1,01,158

90,408

32,695

16

Karnataka

3,48,455

2,84,298

1,27,729

17

Kerala

76,591

59,568

43,946

18

Ladakh (UT)

382

382

108

19

Lakshadweep (UT)

20

Madhya Pradesh

4,84,946

4,23,791

2,16,918

21

Maharashtra

12,47,828

6,76,852

5,12,249

22

Manipur

32,027

15,610

376

23

Meghalaya

3,966

2,509

329

24

Mizoram

11,150

5,737

1,292

25

Nagaland

21,567

19,490

2,366

26

Odisha

1,50,141

86,444

60,051

27

Puducherry (UT)

10,075

9,023

2,841

28

Punjab

70,038

62,614

37,083

29

Rajasthan

1,42,613

1,07,697

1,02,030

30

Sikkim

134

134

134

31

Tamil Nadu

4,24,139

3,47,690

2,21,490

32

Telangana

96,127

93,765

83,639

33

Tripura

29,605

17,928

7,183

34

Uttar Pradesh

14,73,437

12,00,310

7,85,962

35

Uttarakhand

47,774

19,552

15,258

36

West Bengal

3,80,811

2,55,614

1,07,958

Total

82,37,454

61,81,410

32,18,508