“Housing for all” by 2022, achievements made during the last three years

“Housing for all” by 2022, achievements made during the last three years

GOVERNMENT OF INDIA
MINISTRY OF HOUSING AND URBAN AFFAIRS

RAJYA SABHA 

UNSTARRED QUESTION NO. 1037
TO BE ANSWERED ON FEBRUARY 10, 2021 

‘HOUSING FOR ALL’ BY 2022

HOUSING FOR ALL

NO. 1037. SHRI M. SHANMUGAM

Will the Minister of Housing and Urban Affairs be pleased to state:

(a) whether Government is committed to the promise of ‘Housing for All’ by 2022;

(b) if so, the targets and achievements made during the last three years, State-wise;

(c) the details of low-cost houses using alternative global technologies and materials proposed in various cities; and

[post_ads]

(d) the time by when the projects would be completed, the details thereof?

ANSWER
THE MINISTER OF STATE (INDEPENDENT CHARGE) OF THE MINISTRY
OF HOUSING AND URBAN AFFAIRS

(SHRI HARDEEP SINGH PURI)

(a) Yes, Sir.

(b) The details about targets and achievements made during the last three years, State- wise, areannexed as Annexure – I.

(c) The Union Government, under Global Housing Technology Challenge-India, had launched 6 Light House Projects in 6 cities using innovative, alternate, resource efficient and sustainable technologies. The details are annexed as Annexure – II.

(d) PMAY-U Mission has strategized to complete the construction of houses sanctioned under the Mission by the year 2022.

[post_ads_2]

Annexure I referred in reply to RSUQ No 1037 due for 10-02-2021

State UTs wise details of construction of houses along with houses sanctioned and constructed during last three years (FY 2017-20) under PMAY-U

S. No

States/UTs

Cumulative Houses Sanctioned so far

(Nos)

Cumulative Houses Completed so far

(Nos)

Houses Sanctioned during last

three years (Nos)

Houses Constructed during last three years

(Nos)

1

A&N Island

612

40

41

20

2

Andhra Pradesh

20,26,469

3,57,174

12,45,806

3,20,114

3

Arunachal Pradesh

7,425

3,250

5,654

1,709

4

Assam

1,23,268

24,690

1,06,547

18,181

5

Bihar

3,60,717

78,171

2,32,495

52,793

6

Chandigarh

1,316

6,276

574

574

7

Chhattisgarh

2,62,670

1,24,178

2,09,765

81,080

8

UT of DNH & DD

7,173

4,611

5,384

3,372

9

Delhi (UT)

22,859

46,839

18,986

26,386

10

Goa

3,559

3,500

975

916

11

Gujarat

7,59,137

5,15,159

5,19,380

3,56,235

12

Haryana

2,78,860

34,714

2,67,301

23,272

13

Himachal Pradesh

12,210

4,945

5,260

3,328

14

Jammu & Kashmir

55,832

9,557

49,191

5,342

15

Jharkhand

2,12,822

92,291

1,39,327

70,539

16

Karnataka

6,72,333

2,16,911

5,16,067

1,56,598

17

Kerala

1,24,963

88,551

87,836

70,814

18

Ladakh (UT)

1,777

384

1,048

308

19

Lakshadweep (UT)

20

Madhya Pradesh

8,41,298

4,04,072

5,93,219

3,09,352

21

Maharashtra

12,86,611

4,11,334

10,77,988

2,73,122

22

Manipur

50,176

4,925

32,904

3,055

23

Meghalaya

4,766

1,091

4,639

458

24

Mizoram

35,779

4,270

19,978

2,652

25

Nagaland

32,003

4,293

18,441

1,759

26

Odisha

1,73,480

83,262

1,11,855

63,864

27

Puducherry (UT)

14,537

5,322

8,693

2,869

28

Punjab

1,02,763

36,817

51,881

23,467

29

Rajasthan

2,12,925

1,15,174

1,55,968

58,270

30

Sikkim

567

274

543

81

31

Tamil Nadu

6,99,644

3,68,920

4,28,775

2,57,682

32

Telangana

2,10,111

1,45,719

1,36,069

1,00,455

33

Tripura

86,199

45,293

33,933

42,227

34

Uttar Pradesh

17,67,142

6,94,920

15,53,949

4,75,255

35

Uttarakhand

40,831

18,277

30,288

12,792

36

West Bengal

4,95,931

2,45,593

2,73,366

1,66,271

Total

109,88,765

42,00,797

79,44,126

29,85,212

Annexure II referred in reply to RSUQ No 1037 due for 10-02-2021 
Details of Light House Projects

Sl.

No.

Location
of LHP

Name of Technology

No. of Dwelling Units

Central Share (
₹ in crore
)

State/ Beneficiary Share

Total Cost (
₹ in crore)

Central Assistance

Technology Innovation Grant

1

Agartala, Tripura

Light Gauge Steel Structural System & Pre- engineered
Steel Structural System

1,000

15

50

97.5

162.5

2

Indore, Madhya Pradesh

Prefabricated Sandwich Panel System

1,024

15.36

40.96

71.68

128

3

Lucknow, Uttar Pradesh

PVC Stay In Place Formwork System

1,040

15.6

41.6

73.7

130.9

4

Chennai, Tamil Nadu

Precast Concrete Construction System – Precast Components
Assembled at Site

1,152

17.28

46.08

52.9

116.26

5

Rajkot, Gujarat

Monolithic Concrete Construction using Tunnel Formwork

1,144

17.16

45.76

55.97

118.89

6

Ranchi, Jharkhand

Precast Concrete Construction System – 3D Volumetric

1,008

15.12

40.32

78.56

134

Total

6,368

95.52

264.72

430.31

790.55

Source: https://pqars.nic.in/annex/253/AU1037.pdf
नोट :- हमारे वेबसाइट www.indiangovtscheme.com पर ऐसी जानकारी रोजाना आती रहती है, तो आप ऐसी ही सरकारी योजनाओं की जानकारी पाने के लिए हमारे वेबसाइट www.indiangovtscheme.com से जुड़े रहे। 
*****