GOVERNMENT OF INDIA 
MINISTRY OF RAILWAYS 

LOK SABHA 

STARRED QUESTION NO.29 
TO BE ANSWERED ON 12.12 2018 

ELECTRIFICATION OF RAILWAY TRACKS 
*29. SHRIMATI K. MARAGATHAM: 
Will the Minister of RAILWAYS be pleased to state: 
  • (a) whether it is a fact that the Government has approved the proposal for electrification of the remaining 13,675 km. of railway tracks at an estimated cost of over Rs.12,134 crore; 
  • (b) if so, the details thereof; 
  • (c) whether it is also true that the electrification work is likely to be completed by 2021-22; and 
  • (d) if so, the details thereof? 
    Electrification+of+Railway+Tracks
    ANSWER 

    MINISTER OF RAILWAYS AND COAL 
    (SHRI PIYUSH GOYAL) 
              (a) to (d) A Statement is laid on the Table of the House. 
           (a) Yes, Madam. Ministry of Railways has planned for 100% electrification of Broad Gauge (BG) routes and accordingly work for electrification of balance BG routes of 13,675 Route Kilometer (RKM) has been approved at a cost of  12,134 crore. 
            With above, Indian Railways will be first major railway in world to have 100% electrified BG railway network of such size, confirming its commitments towards green and clean environment. 
    100% electrification will entail following advantages: 
    • (i) Reduced energy bill of Railways by about ` 13,000 crores per annum. 
    • (ii) Reduction in diesel oil consumption by about 2.8 billion liters, thereby reducing dependence on imported diesel oil and saving foreign exchange. 
    • (iii) Amenable to adoption of renewable sources of energy like solar, wind power. 
    • (iv) Haulage of heavier freight and longer passenger trains at higher speed due to higher haulage capacity of electric loco. 
    • (v) Increased capacity of railway network due to reduced detention and seamless transport on electric traction. 
    • (vi) Reduce carbon emission and improve environment particularly in cities like New Delhi. 
    • (b) Details of section with kilometers and cost are as under: 
    SNName of ProjectZonal Railway (s)RKMCost ` inCr. (Estimate)
    1
    Lonand-PhaltanCentral
    26
    19.96
    2
    Dauram Madhepura-PurniaEast Central77.3081.06
    3
    Muzaffarpur – SitamarhiEast Central64.5270.99
    4
    Dildarnagar-TarighatEast Central18.6715.63
    5
    Khurda Road – BalangirEast Coast
    301
    269.09
    6
    Lanjigarh Road- Junagarh RoadEast Coast
    56
    56.51

    SNName of ProjectZonal Railway (s)RKM
    Cost ` in Cr. (Estimate)
    7
    Naupada-GunupurEast Coast
    90
    89.82
    8
    Katwa-AhmadpurEastern
    52
    53.66
    9
    Rampurhat(excl.) – Dumka – Bhagalpur(excl.) & Jasidih –
    Deoghar – Dumka(excl.) incl. Barahat – Banka(excl.) –
    Chandan – Deoghar andMadhupur – Giridih
    Eastern
    361
    304.52
    10Shahjahanpur-Pilibhit, Pilibhit-TanakpurNorth Eastern145.46143.15
    11Hathua-Bathua Bazar- Bhatni New lineNorth Eastern79.670.35
    12Salempur-Barhaj Bazar exisiting BG lineNorth Eastern20.2513.11
    13Duraundha-Maharajganj- MasrakhNorth Eastern41.5338.19
    14Mandhana Jn-BrahmavardNorth Eastern
    8
    6.98
    15Gorakhpur-Anand Nagar- Gonda &Anand Nagar- NautanwaNorth Eastern261.61202.94
    16Gonda- BahraichNorth Eastern59.8462.19
    17Moradabad-Kashipur- Ramnagar, Rampur-Lalkua- Kathgodam
    incl. Lalkua- Kashipur and Bareilly-Lalkua
    North Eastern
    309
    236.73
    18Paniahwa – Chhitauni –

    Tamkuhi Road
    North Eastern67.6961.11
    19Barhan-EtahNorth Central
    59
    52.13
    20Mahoba-UdaipuraNorth Central
    196
    168.2
    21Luni-MarwarNorth Western71.7156.58
    22Bikaner-Merta-Jodhpur and Merta-PhuleraNorth Western
    424
    374.63
    23Degana – RatangarhNorth Western142.89111.55
    24Hanumangarh-Sriganganagar- Sarupsar-Suratgarh incl
    Sarupsar-Anupgarh
    North Western
    281
    228.87

    SNName of ProjectZonal Railway (s)RKM
    Cost ` in Cr. (Estimate)
    25Hisar-SuratpuraNorth Western64.649.96
    26Samdari – Barmer-MunabaoNorth Western250.29173.75
    27Udaipur City – HimmatnagarNorth Western209.66194.29
    28Sikar-LoharuNorth Western
    122
    102.51
    29Mavli – Bari SadriNorth Western
    82
    55.24
    30Dausa-Gangapur cityNorth Western
    93
    77.46
    31Madar-PushkarNorth Western25.722.95
    32Ringas-Sikar-ChuruNorth Western
    140
    96.31
    33Thiyat Hamira-Sanu incl. Pipar Road-Bilara,Makrana-
    Parbatsar and Merta Rd- Merta city
    North Western135.7290.09
    34Chaparmukh-Silghat Town incl. Senchoa Jn-Mairabari single
    line
    NortheastFrontier
    130
    109.35
    35Lumding-Badarpur single lineNortheastFrontier
    172
    189.04
    36Badarpur-Jiribam,Katakhal- Bhairabi & Badarpur-
    Karimganj-Sabroom incl.

    Karimganj-Maishasan, Agartala-Akhaura &
    Baraigram-Dullabachera
    NortheastFrontier
    590
    494.24
    37Rangiya Jn.- Rangapara- Harmuty – Naharlagun including
    branch lines
    NortheastFrontier
    339
    311.09
    38Mariani-Jorhat town- Furkating & Tinsukia Jn –
    Makum-Tirap & Makum- Dangri single line
    NortheastFrontier
    174
    183.99
    39Harmuty-Murkongselek including branch lineNortheastFrontier
    230
    237.52
    SNName of ProjectZonal Railway (s)RKM
    Cost ` in Cr. (Estimate)
    40Katihar – Jogbani single lineNortheast Frontier
    109
    109.91
    41Raninagar– Haldibari single lineNortheast Frontier
    34
    27.71
    42New Jalpaigudi-New Mal Jn- Alipurduar-Samuktala and
    Alipurduar-New Coochbehar incl. New Mal Jn- Changrabandha,
    New Changrabandha- New Coochbehar, New Coochbehar –
    Bamanhat, New Coochbehar – Fakiragram-Dhubri
    Northeast Frontier
    506
    475.31
    43Katihar-Teznarayanpur, Barsoi- Radhikapur &
    Eklakhi-Balurghat single line
    Northeast Frontier
    176
    154.87
    44Aluabari-Siliguri via BaghdograNortheast Frontier76.2359.6
    45Prayag-Prayag ghatNorthern2.460.68
    46Raebareli-Unchahar incl. Dalmau-DaryapurNorthern
    63
    44.92
    47Phaphamau-PratapgarhNorthern
    46
    36.9
    48Akbarpur-Faizabad-BarabankiNorthern
    161
    211.7
    492nd Line Utratia-Raebareli- AmethiNorthern
    126
    63.32
    50Amb Andaura-TalwaraNorthern
    40
    34.21
    51Bhatinda-Firozpur-Jalandhar City Incl. Lohian Khas-Nakodar-
    Phillaur & Nakodar-Jalandhar
    Northern
    301
    223.93
    52Ludhiana – Ferozpur City – Hussainiwala including Ferozpur
    City – Fazilka – Abohar & Kotkapura – Fazilka
    Northern
    339
    235.08
    53Phagwara Jn. – Nawanshahar Doaba-Jaijon Doaba incl.

    Nawanshahar-Rahon
    Northern
    74
    56.89
    54Jalandhar City – HoshiarpurNorthern38.431.81
    55Verka Jn. – Dera Baba NanakNorthern
    45
    33.38
    56Taran Taran – Patti – KhemkaranNorthern54.441.79
    57Batala Jn. – QadianNorthern
    19
    11.35
    SNName of ProjectZonal Railway (s)RKM
    Cost ` in Cr. (Estimate)
    58Bathinda Jn. – Abohar-Sri GanganagarNorthern
    125
    116.75
    59Sonipat- Gohana- JindNorthern
    86
    80.55
    60Raja Ka Sahaspur-Sambhal Hatim SaraiNorthern
    23
    15.84
    61Faizabad – Sultanpur-ChilbilaNorthern94.460.14
    62Janghai-ZafrabadNorthern
    47
    49.19
    63Parli Vaijnath – VikarabadSouth Central
    269
    262.12
    64Pimpalkutti-Mudkhed & Parbhani

    -Parli Vaijnath
    South Central
    246
    224.17
    65Tenali-RepalleSouth Central
    34
    25.98
    66Nandyal-YerraguntlaSouth Central
    123
    111.48
    67Purna-AkolaSouth Central
    209
    211.58
    68Lingempet Jagtiyal-NizamabadSouth Central
    95
    80.29
    69Dharamavaram-PakalaSouth Central
    228
    210.47
    70Gadwal-RaichurSouth Central
    57
    46.1
    71Tirodi-KatangiSouth East Central
    15
    6.53
    72Wadsa-GadchiroliSouth East Central49.237.87
    73Tumsar Road – TirodiSouth East Central46.853.51
    74Balaghat-KatangiSouth East Central46.843.36
    75Marauda- DallirajharaSouth East Central
    76
    75.96
    76Rupsa-BangriposiSouth Eastern
    89
    68.66
    77Bankura-MashagramSouth Eastern
    118
    92.8
    78Tata-BadampaharSouth Eastern
    89
    70.08
    79Loops and Yard LinesSouth Eastern
    0
    116.85
    SNName of ProjectZonal Railway (s)RKM
    Cost ` in Cr. (Estimate)
    80Hospet-SwamihalliSouth Western
    59
    61.81
    81Birur-TalguppaSouth Western
    161
    151.99
    82Mysuru- Hassan-Mangalore incl. Arsikere -HassanSouth Western
    347
    315.81
    83Mysuru-ChamarajanagarSouth Western
    61
    56.71
    84Kadur-ChikmaglurSouth Western
    46
    39.74
    85Chikbanavar-HassanSouth Western
    166
    155.17
    86Bangarpet-YelehankaSouth Western
    149
    138.21
    87Dindigul-PalghatSouthern
    179
    159.08
    88Tiruchchirapalli-Manamadurai- VirudunagarSouthern
    217
    193.44
    89Salem-Vridachalam-Cuddalore PortSouthern
    196
    179.27
    90Shoranur-NilamburSouthern
    66
    53.68
    91Kollam-PunalurSouthern
    44
    43.44
    92Virudunagar – Tenkasi JnSouthern
    122
    94.45
    93Sengottai- Tenkasi Jn. – Tirunelveli-TiruchendurSouthern
    141
    121.14
    94Madurai – Manamadurai Jn.- RameswaramSouthern
    161
    158.28
    95Pollachi-PodanurSouthern
    40
    37.36
    96Kanalus-Wansjalia-PorbandarWestern103.3396.82
    97Rajkot-Jetalsar-Verval-Somnath with Jetalsar-WansjaliaWestern277.54223.73
    98Mhow-KhandwaWestern
    138
    127.82
    99Vasad- KathanaWestern
    43
    40.1
    100Anand- KhambhatWestern51.7948.12
    101Vishvamitri – Pratap Nagar – Chhota udepurWestern
    102
    95.71
    102Kanjari Boriyavi- VadtalWestern
    6.4
    5.71
    103Nadiad- ModasaWestern104.7999.33

    SNName of ProjectZonal Railway (s)RKM
    Cost ` in Cr. (Estimate)
    104Ankleshwar – RajpiplaWestern62.8458.82
    105Jhund-KharagodaWestern23.323.27
    106Adipur- New BhujWestern48.9448.36
    107Mahesana- Patan-BhildiWestern90.6196.24
    108Dhola- Bhavnagar with SihorJn.- Palitana & Rajula Road
    Jn- Mahuva
    Western119.21121.51
    Total
    13675.4812134.50

    (c) Yes, Madam.
    (d) Action Plan to electrify balance Broad Gauge (BG) Routes is as under:-
    YearRoute Kilometers planned for electrification
    2018-19
    6000
    2019-20
    7000
    2020-21
    10500
    2021-22
    10500